Trusted media brand of the Chartered Institute of Housing
Trusted media brand of the Chartered Institute of Housing
Studio E project lead says insulation manufacturer ‘calculatedly sought to deceive’ with marketing material
Studio E Architects’ project lead for the Grenfell Tower refurbishment said claims made about the insulation product used for the block’s tragic refurbishment were as misleading as those in 2013’s horsemeat scandal.
Neil Crawford, who is not a part III-qualified architect, took over day-to-day responsibility for co-ordinating his practice’s work on the high-rise block in 2014. He told Monday’s hearing of the inquiry into the fatal 2017 fire that the literature he had read on Celotex RS5000 led him to believe it was suitable for use on high-rise buildings.
Studio E did not specify the product’s use as part of the aluminium composite material (ACM) cladding used for the tower’s refurbishment. It had been substituted for a different Celotex product – FR5000 – originally proposed by consultant Max Fordham. In fact, neither product was compliant with Building Regulations.
…
Already registered? Login here
Stay at the forefront of thought leadership with news and analysis from award-winning journalists. Sign up below to receive:
It takes less than one minute….
… or subscribe for full access - Subscribe now